Texas Instruments Engineering
Change Management System
Texas Instruments
Business Need / Opportunity
Incremental design changes are causing multiple tooling
NRE changes by vendors for same design and delay in substrates
delivery.
Solution
A WEB-enabled program for combining several single-change
inputs into one multiple-change input for specific part numbers
based on users target schedule, priority and existing change
inputs for that part number. Additionally, a WEB-enabled database
allows easy input and tracks by project managers, package
designers, procurement, process and manufacturing engineering
within the change control group in US and Philippines.
Goals and Objectives
The objective of this project is to design and implement
an Intranet WEB-enabled system for managing and organizing
package design change inputs for DSP FCBGAs. The goal is to
reduce the engineering and tooling costs associated with frequent
incremental ECRs (Engineering Change Requests) by combining
several "single-change" inputs into one "multiple-change"
input for an ECR. Also, to better implement package changes
by providing user inputs for schedule and priority targets,
as well as tracking each change input by product.
|